Property is the former Holy Trinity Catholic School and Church facility. Includes 2 large buildings, a Chapel of approximately 5,712 SF and a 10,080 SF steel building. The Chapel is brick masonry on slab and the steel building is constructed on concrete slab with a metal roof. In 2018 Hurricane Florence damaged the buildings, resulting in the relocation of both church and school. The buildings have been stripped of damaged materials, resulting in both buildings being in a shell condition.